Leaded wooden frame 6.0mm per 10cm linear - outline width 100mm leaded
Features :
- Leaded wooden vision bays for anti-X protection in radiology rooms
- Lead equivalent on request: 6.0 mm
- Viewing window consisting of a leaded frame in exotic wood, ready-to-paint finish,
- Section 70 x 70*, standard dimensions or made-to-measure with panoramic glazing
allowing partial or total vision.
- Standard bay dimensions: Width: 1300 mm x Height 900 mm
- Standard dimensions of leaded glazing: Width: 1200 mm x Height: 800 mm.
- LEADED WOODEN VISION WINDOWS
- Including: Cover joints leaded in medium width 125 mm