Wooden frame Pb 6,0mm per 10cm long Leaded circumference 100mm wide
Leaded wooden frame 6.0mm per 10cm linear - outline width 100mm leaded
Features :
- Leaded wooden vision bays for anti-X protection in radiology rooms
- Lead equivalent on request: 6.0 mm
- Viewing window consisting of a leaded frame in exotic wood, ready-to-paint finish,
- Section 70 x 70*, standard dimensions or made-to-measure with panoramic glazing
allowing partial or total vision.
- Standard bay dimensions: Width: 1300 mm x Height 900 mm
- Standard dimensions of leaded glazing: Width: 1200 mm x Height: 800 mm.
- LEADED WOODEN VISION WINDOWS
- Including: Cover joints leaded in medium width 125 mm
Features :
- Leaded wooden vision bays for anti-X protection in radiology rooms
- Lead equivalent on request: 6.0 mm
- Viewing window consisting of a leaded frame in exotic wood, ready-to-paint finish,
- Section 70 x 70*, standard dimensions or made-to-measure with panoramic glazing
allowing partial or total vision.
- Standard bay dimensions: Width: 1300 mm x Height 900 mm
- Standard dimensions of leaded glazing: Width: 1200 mm x Height: 800 mm.
- LEADED WOODEN VISION WINDOWS
- Including: Cover joints leaded in medium width 125 mm
- Lead equivalence mm
- 6
- Material
- Bois
- Coating
- Brut à peindre
- Length mm
- 100
- Width mm
- 70
- Thickness mm
- 70
- Net weight kg
- 1,88
- Gross weight kg
- 2,58
- CE
- NFC15-160
106522
6 other products in the same category: